Australia Pacific LNG (APLNG)

Australia Pacific LNG (APLNG) Posted on

Australia Pacific LNG (APLNG) Upstream Phase 1 Project – FID 1& FID 2
Awarded by Siemens Australia on May 2012 – Completed August 2013
  • Design, Manufacture, Test and delivery of 27 off Siemens Sivacon S8, Single sided and Back-to-back, IP54, 415V Motor Control Centers and Main Switchboards for all site
  • Design, Manufacture, Test and delivery of 2 off Siemens Sivacon S8, Outdoor Switchboard for Condabri Central WTF site and Reedy Creek WTF site
  • Design, Manufacture, Test and delivery of 163 off Distribution Boards for all sites.
  • Design, Manufacture, Test and delivery of 24 off Local Control Panels Condabri Central
Australia Pacific LNG (APLNG) Upstream Phase 1 Project – Talinga PCF Project
Awarded by Siemens Australia onMarch 2013 – Completed July 2014
  • Design, Manufacture, Test and delivery of 1 off Siemens Sivacon S8, Back-to-back, IP54, 415V Motor Control Centers for Talinga site
  • Design, Manufacture, Test and delivery of 4 off Distribution Boards for Talinga Site
Australia Pacific LNG (APLNG) Upstream Phase 1 Project – Spring Gully PCF Project
Awarded by Lend Lease on November 2013 – Completed February 2014
  • Design, Manufacture, Test and delivery of 1 off Siemens Sivacon S8, Back-to-back, IP54, 415V Motor Control Centers for Spring Gully site
Australia Pacific LNG (APLNG) Upstream Phase 1 Project – Reedy Creek PTF Project
Awarded by Veolia Water Solution on May 2014 – Completed September 2014
  • Design, Manufacture, Test and deliveryof 1 off Siemens Sivacon S8, Back-to-back, IP42, 415V Motor Control Centers Reedy Creek site.
  • Supply and delivery of 1 off Portable Switchroom
  • Installation and Integration Testing of above MCC and other Equipment in the Switchroom.