BOC –Linde Group

BOC –Linde Group Posted on

Kwinana Air Separation Plant
Awarded April 2013 – Completed February 2014
  • Supply of 2 off Portable Switchrooms
  • Design, Manufacture, Test and deliveryof 2 off Siemens Sivacon S8, single sided, IP41, 415V Motor Control Centers
  • Supply of Distribution Boards, UPS System DC System, and Local control Station
  • Installation, and Integration Testing of above MCC and Equipment in the Switchrooms.
Glenbrook Air Separation Plant
Awarded September 2012 – Completed April 2013
  • Supply of 2 off Portable Switchrooms
  • Design, Manufacture, Test and deliveryof 2 off Siemens Sivacon S8, single sided, IP41, 415V Motor Control Centers
  • Supply of Distribution Boards, UPS System DC System, and Local control Station
  • Installation, and Integration Testing of above MCC and Equipment in the Switchrooms.
Karratha Air Separation Plant
Awarded May 2011 – Completed January 2012
  • Supply of 1 off Portable Switchrooms
  • Design, Manufacture, Test and deliveryof 1 off Siemens Sivacon S8, single sided, IP41, 415V Motor Control Centers
  • Supply of Distribution Boards, UPS System DC System, and Local control Station
  • Installation, and Integration Testing of above MCC and Equipment in the Switchroom
Dandenong Air Separation Plant
Awarded November 2010 – Completed September 2011
  • Supply of 2 off Portable Switchrooms
  • Design, Manufacture, Test and deliveryof 2 off Siemens Sivacon S8, single sided, IP41, 415V Motor Control Centers
  • Supply of Distribution Boards, UPS System DC System, and Local control Station
  • Installation, and Integration Testing of above MCC and Equipment in the Switchrooms